There’s Always a ProjectSearch
← All calculators

Build & renovate

Renovate or rebuild

Compare two options delivering the same floor area and finish. Include survey findings in the renovation allowance.

Calculation method

A positive difference means renovation costs less. The extra overrun applies to renovation works including retained systems, in addition to the entered contingency.

Key inputs · Renovation works (฿), Retained systems and survey allowance (฿), Accommodation during renovation (฿), Renovation works contingency (%).