There’s Always a Project
← Field journal

Before the walls close

Where should the Ethernet sockets go before the walls are finished?

Use the furniture plan to place Ethernet sockets for the desk, TV and Wi-Fi access point. Take a six-run example and an outlet schedule to your installer.

Put the desk and the TV cabinet on the floor plan first. At our desk, the MacBook reads files from the office NAS at 243.1 MB/s over Ethernet. On Wi-Fi in that same room, it measured 62.8 MB/s. In the living room, a single Ethernet connection lets the Apple TV play a film stored in the office. Those two jobs give me a reason to spend money on sockets in those particular places. See the household speed tests.

Where would you use a wired connection?

For a new build or renovation, walk through an ordinary evening with the furniture plan in hand. The following is an example to mark up with an installer. The socket counts are choices for that example.

Home office
Mark the desk position, including which side the laptop dock will sit on. Price two sockets there if you want a computer and network storage to have independent runs back to the cabinet. Another option is one wall socket and a small powered switch at the desk. Our Mac and NAS use the same office switch, so a file copy between them stays at the desk.
Living room
Put one socket within reach of the media cabinet for the streaming player. Add a second if a console will use Ethernet too. Check the outlet against the actual cabinet back and TV bracket so you can reach the plug after the furniture is in. How the wired Apple TV plays our NAS library.
Spare room or future study
If someone might work here, mark the wall where a desk fits with the bed in place. Ask what a finished socket would cost while the wall is open. An accessible empty conduit with a draw cord is worth pricing if the cable can wait.
Ceiling or high wall
If the plan includes a wired Wi-Fi access point, have the installer mark its mounting position and a cable route back to the switch. Check how you will reach the mount for maintenance. For a device powered over Ethernet (PoE), confirm the power type its port needs and that the switch has enough total power for all the devices it will supply. Ubiquiti’s guide to PoE power requirements.

Will the plug fit once the furniture is in?

In our planning notes I wanted an Ethernet socket beside a power outlet in a concrete wall. I was looking for a slim or angled faceplate so the lead would fit behind the furniture. Hold the proposed plate, plug and a short patch lead in position with the desk or cabinet against the wall. Check that the lead can turn and the plug can still be released. Give the electrician the two outlet positions and ask them to specify the data conduit route and its separation from the power wiring before anyone cuts the wall.

Decide where the cables meet

Give each finished socket its own run back to a labelled position at the network cabinet. In the example above, two office sockets, two TV sockets, one spare-room socket and one ceiling cable make six cable runs. Reserve six positions on the patch panel, the row of sockets where those cables end. Count switch ports separately. Each run you want active needs a port, and an external router connection uses another.

On the plan, mark where the provider’s fibre enters, where its equipment will sit, and how the cable gets from there to the cabinet. Allow space for power plugs, an open cabinet door and warm air to escape. Trace cable lengths along the actual route, including the rise to the ceiling and the drop to the outlet. A conventional copper Ethernet design allows up to 90 m for the fixed link and 100 m overall with patch cords. Bring any unusually long run to the installer before agreeing the route. Fluke Networks’ residential cabling reference.

What to ask the installer to hand over

Take this example schedule to the site walk. Write the chosen wall and height in the final column and mark the same IDs on the plan.

Example outlet schedule for the installer
LocationCable IDsWall or ceiling position and height (mm)
DeskOffice 1, Office 2________________
TV cabinetTV 1, TV 2________________
Spare roomStudy 1________________
Access pointCeiling 1________________
  1. A marked-up plan before the walls close. Give each outlet a short ID. For example, mark Office 1 beside the desk on the plan, at the wall plate and on the cabinet termination. Agree the outlet heights relative to the finished floor and photograph the routes before plastering.
  2. An itemised quote. List the cable and socket category, the number of finished runs, any empty conduits and the test included for each run. Ask the installer and electrician to agree the routes wherever data cabling meets the electrical work.
  3. A result for each labelled run. A wire-map check shows whether the individual conductors connect correctly. If the quote promises certified Category 6 or 6A cabling, ask for a passing permanent-link certification report against that category for each run. Keep the reports with the final plan. Fluke Networks explains the different cable tests.

On handover day, take a laptop to the desk, plug it into the labelled socket and open a file on the home network. Then check playback from the sofa. Those are the two things I’d want to do on moving day, and both can be tried while the installer is still there.

Sources

Household network measurements from March 2026 and renovation planning notes on conduit and wall plates from October 2026. The six runs are a worked design example. Equipment and cable-test references appear alongside the relevant steps.